language

    How do you climb and land?


    Release time:

    2022-12-30

    Climb process: all check the climbing organization, frame body and obstacles → set the electric hoist and debug the pre-tightening → exempt the upper frame body from pulling the structure → exempt the safety vertical net outside the frame body at the segment → raise the frame body by 100mm → remove the unloading seat → raise the height of one floor of the frame body → set the unloading seat → pull the upper climbing frame body (the pulling distance is not more than 6m)→ close the safety vertical net outside the frame body at the frame body at the segment → raise the wire rope position of upper device → remove the lowest anti-drop bar, the orientation of the device to the top floor → the construction of the first floor → the adjustable tie rod on the upper part of the device and the guide seat attached to the wall → check before raising → prepare to enter the next time

    Climb process: all check the climbing organization, frame body and obstacles → set the electric hoist and debug the pre-tightening → exempt the upper frame body from pulling the structure → exempt the safety vertical net outside the frame body at the segment → raise the frame body by 100mm → remove the unloading seat → raise the height of one floor of the frame body → set the unloading seat → pull the upper climbing frame body (the pulling distance is not more than 6m)→ close the safety vertical net outside the frame body at the frame body at the segment → raise the wire rope position of upper device → remove the lowest anti-drop bar, the orientation of the device to the top floor → the construction of the first floor → the adjustable pull rod on the upper part of the device and the wall-attached guide seat → check before raising → prepare to enter the next lifting cycle.

    Key words:

    Learn more news

    What is a wooden I-beam

    I-shaped wooden beam is an important component in the international common building template system, it has the characteristics of light weight, high strength, good linearity, not easy to deform, surface water resistance, acid and alkali resistance, etc., can be used all year round, the cost of amortization is low, and can be used with domestic and foreign professional template system products.

    In building construction, how to save the use of building templates?

    There is a material waste in the use of building formwork in many construction sites. How to save materials when building construction?

    On the purchase of building templates should pay attention to the 6 major issues?

    How to choose and buy building templates and how to identify the quality of building templates, which requires a parameter index of building templates to measure. Building formwork is an important tool for concrete structure engineering construction, and formwork technology directly affects the quality, cost and efficiency of engineering construction. So how do we choose and buy building templates and what are the indicators of building templates?

    To maximize the value of building templates

    With the continuous innovation and development of the construction industry, more and more difficult construction makes us wonder how to complete it safely. As an important building template in construction, how should we give full play to our advantages?